For builders and remodelers
Garage doors for builders, remodelers and ADU projects
DoorsEZ supplies and installs Clopay, Wayne Dalton and C.H.I. garage doors and openers for general contractors, remodelers and ADU builders, from Fullerton across Orange County and nearby cities such as Riverside, Eastvale and Rancho Cucamonga. We measure the opening, price the job in writing and book the install around your schedule. Every opener we install is reverse-tested before we leave.

Open 24/7 ยท a person answers
Same-day on most repairs booked by 11 am.
Callback within 15 minutes
Day or night, every day.
Written price first
Nothing starts until you approve it.
CSLB Lic. #859029
C-61 / D-28 ยท Verify on the CSLB website (opens in a new tab)
The problem
What goes wrong with most door vendors
- The door arrives and the opening is short on the headroom or side room the track needs.
- The installer shows up before the opening is ready, or after the date the final inspection needed.
- The file needs a license lookup and a certificate of insurance, and the door vendor never sends them.
- An old opener gets reused on a new door, and the job stalls when someone notices it has no battery backup.
- The quote is a single number, with no model, size or opener listed to check against the plans.
The program
What you get with a DoorsEZ account
Clopay, Wayne Dalton and C.H.I. doors
Choose steel, wood-look, real wood, aluminum or glass, insulated or non-insulated, in raised-panel, carriage-house or modern styles with window options. Tell us the door size and model, or ask us to suggest one.
Paperwork for your vendor file
Ask for our W-9, our certificate of insurance and the state license lookup link whenever your file or the owner needs them.
Installs scheduled around the build
We measure once the opening is framed and confirm the order with you. Then our dispatcher books the install window with your superintendent or project manager.
New construction and ADU garages
We install doors on attached, detached and ADU garages, including insulated models. Every opener comes with the battery backup that Health and Safety Code section 19892 requires.
Replacement doors on remodels
On a remodel, we check the existing opener first. Health and Safety Code section 19892(c) bars connecting a replacement door to an opener without a battery backup, so the written quote covers what the law requires.
Itemized written quotes
Each quote lists the manufacturer, model, size, insulation, opener and hardware, so you can check it against the plans and your own bid.
Commitments
What we put in writing
- Every quote is written and itemized. Nothing is ordered or installed until you approve it.
- Before we leave, we test every opener we install with the two-inch reverse test from Health and Safety Code section 19890.
- We never connect a new door to an opener that lacks the battery backup Health and Safety Code section 19892 requires.
- We send our certificate of insurance and license lookup link whenever you ask.
- We call back within 15 minutes, day or night.
Getting started
How an account starts
Send the plans or the opening
Upload plans or photos with the door count, sizes and your target install week, or call (833) 366-7739.
Get a written quote
We send an itemized written quote for each door and opener.
Measure after framing
Once the opening is framed, the technician checks the measurements before we place the order.
Book the install window
Our dispatcher confirms the install window with your superintendent or project manager, timed for when the opening is ready.
Install and test
We install the door and opener and run the reverse test before we leave.
When in the build should we call DoorsEZ?
As soon as you know the door size. The headroom, side room and backroom a door needs depend on the door and track you choose, so settling the door before framing avoids reworking the header. We measure once the opening is framed.
Can the homeowner's existing opener go on the new door?
Only if it has a battery backup. Health and Safety Code section 19892(c) bars connecting a replacement door to an existing opener that lacks one, however old it is. If the opener also fails the two-inch reverse test, Health and Safety Code section 19890 bars connecting a replacement door to it.
Do you install doors on ADU and detached garages?
Yes. They get the same measurement, written quote and reverse test as any other install. If the plan converts part of a garage, tell us early so the door size and opener location match the new layout.
Why might we receive a preliminary notice from you?
When we work as a subcontractor, California lets us protect our payment rights by serving a preliminary notice on the owner, the direct contractor and the construction lender within 20 days of first furnishing work (Civil Code sections 8200 and 8204). If you receive one from us, it is routine paperwork, not a dispute.
Do you handle commercial door projects?
Yes, we sell and install garage doors and openers for businesses as well as homes. For commercial roll-up or dock doors, call (833) 366-7739 first and ask. Send the door list with your bid request, and we quote each opening in writing.

Open 24/7 ยท a person answers
Send us your next garage opening
Send the plans, the door sizes and the week you need the install. We reply with an itemized written quote. Or call (833) 366-7739, day or night.

